(Left) Steven Smith, vice president, Energy Systems Group; presents Alicia Florez, Engineering Manager, Production Plant Barstow, Marine Depot Maintenance Command; with a plaque thanking her for her part in getting the10-acre solar photo voltaic installation aboard the Yermo Annex up and going. The solar farm was officially opened when Col. Craig Clemans, commanding officer, Marine Corps Logistics Base Barstow, Calif., cut the ribbon on the project Oct. 22. The new solar project is expected to save the base $26,000,000 over the 22-year life of the contract with ESG - (Left) Steven Smith, vice president, Energy Systems Group; presents Alicia Florez, Engineering Manager, Production Plant Barstow, Marine Depot Maintenance Command; with a plaque thanking her for her part in getting the10-acre solar photo voltaic installation aboard the Yermo Annex up and going. The solar farm was officially opened when Col. Craig Clemans, commanding officer, Marine Corps Logistics Base Barstow, Calif., cut the ribbon on the project Oct. 22. The new solar project is expected to save the base $26,000,000 over the 22-year life of the contract with ESG.